916-720-1298 info@spiritenergy.com

GOAT

On-demand charging for roadside assistance and uber-ization

Platform Details
Categorye-Boost GOAT
EV ChargersDCFC or Level 2
Charger Power30kW-300kW
Form FactorOn-Demand Generator on a Truck

Flexible Level 3 Fast Charging

The e-Boost GOAT, Generator on a Truck, provides an introductory unit (from50-90 kW) for businesses looking to support their EV driving customers with a reliable charging service. They complement the services of businesses and municipalities, city/state services and schools who want or need to provideEV charging as a service.e-Boost “Uber-izes” EV charging, bypassing long permitting wait times, electrical upgrades, charging network affiliations or servicing agreements.e-Boost provides Level 3 DC fast charging without the costly investment in infrastructure.

 

 

 

Solution to Range Anxiety

On average drivers are 4 minutes from a gas station. But as of 2022, therewere only 5,900 locations with the fastest Level 3 DCFC chargers availableto the public. e-Boost provides a mobile on-demand EV charging as aservice that can bridge infrastructure gaps.

 

“Boosting” can be done in as little as 10 minutes, depending on additional driving range desired and EV battery rating.

A 2022 Tesla Model 3 can be charged up to 120 kW, while a 2022 FordF150 Lightning can be charged slightly faster at 150 kW.

On average charging to 80% takes 20-30 minutes.

Various business models, including leasing, subscription, revenuesharing and financing models are available.

 

A Greener Fuel

Propane is green today because it emits significantly fewer GHG than power from the grid, diesel or gasoline. It is removed in the presence of sunlight or precipitation, while natural gas (which is predominantly methane) has a global warming effect 25x that of CO2.Moreover, renewable Propane (rLPG) is commercially available today and together with renewable DME they are a pathway to net-zero.

Explore more e-Boost Products